iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35519items
    • Facilities
      Facilities
      56038items
    • Lighting and Interior
      Lighting and Interior
      17346items
    • Common materials
      Common materials
      36683items
    • Civil Engineering Materials
      Civil Engineering Materials
      9545items
    • Construction, work and methods
      Construction, work and methods
      27336items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29200items
    • IT/Software
      IT/Software
      33694items
    • others
      others
      76641items
    • Store and facility supplies
      Store and facility supplies
      4385items
    • Office and commercial supplies
      Office and commercial supplies
      11487items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      971items
    • Logistics Equipment
      Logistics Equipment
      6772items
    • Energy and Resources
      Energy and Resources
      11675items
  • Search for companies by industry

    • Information and Communications
      7218
    • others
      7036
    • Building materials, supplies and fixtures manufacturers
      6647
    • Service Industry
      4659
    • Trading company/Wholesale
      3002
    • Other construction industries
      2449
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      489
    • Construction Consultant
      466
    • Architectural design office
      359
    • retail
      346
    • Warehousing and transport related industries
      320
    • Electricity, Gas and Water Industry
      288
    • General contractors and subcontractors
      283
    • Interior construction business
      278
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      201
    • Housing manufacturers and construction companies
      186
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      30
    • Mining
      27
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      7
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Information and Communications
  3. ECADソリューションズ
  4. WIRE CAM DX Implementation Case Study <Dainichi Seisakusho Co., Ltd.> "Even unskilled workers can become immediately effective" Achieving efficiency in panel manufacturing!
CATALOG
  • May 30, 2023
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration
May 30, 2023

WIRE CAM DX Implementation Case Study <Dainichi Seisakusho Co., Ltd.> "Even unskilled workers can become immediately effective" Achieving efficiency in panel manufacturing!

ECADソリューションズ ECADソリューションズ
We would like to introduce how the introduction of "WIRE CAM DX" has addressed the strong sense of crisis regarding the aging of wiring workers at Daiichi Manufacturing Co., Ltd., which broadly engages in equipment design and system design, centered on the manufacturing of distribution boards, control panels, and sub-distribution boards. ■ Background of Introduction - A strong sense of crisis regarding the aging of wiring workers - Establishing a system where anyone can manufacture products with the same quality - Simultaneously aiming for standardization ■ Effects After Introduction - Approximately 15% reduction in overall man-hours from design to manufacturing within about a year and a half after introduction - Changed wiring design to be able to use standardized rules by digitizing wiring routes and know-how - After about six months of training post-operation start, individuals can independently read drawings and perform wiring tasks - By linking data to wire processing machines, mechanizing manual work has led to a reduction in man-hours and an improvement in quality - Overall quality level of products has also improved ■ Product Features "WIRE CAM DX" is simulation software that can create manufacturing information for panels from design drawings. - In addition to CAD data, various files can be used for wiring design. - It can be transitioned to work by non-technicians, enabling an increase in production volume through the establishment of a division of labor system.
  • Inquiry about this news

    Contact Us Online

Related product

大日製作所様_事例.png

WIRE CAM DX Implementation Case Study <Dainichi Seisakusho Co., Ltd.>

Even unskilled workers can become immediately effective! Achieving efficiency in board manufacturing!

We would like to introduce how the introduction of "WIRE CAM DX" has addressed the strong sense of crisis regarding the aging of wiring workers at Daiichi Seisakusho Co., Ltd., which broadly engages in equipment design and system design, centered on the manufacturing of distribution boards, control panels, and sub-distribution boards. ■ Background of Introduction - A strong sense of crisis regarding the aging of wiring workers - Establishing a system where anyone can manufacture products with the same quality - Simultaneously aiming for standardization ■ Reasons for Adopting WIRE CAM DX - Adopted WIRE CAM DX, which allows wiring length measurement not only from ECAD DCX drawings but also from AutoCAD drawings, enabling manufacturing and data integration. ■ Effects After Introduction - Approximately 15% reduction in overall man-hours from design to manufacturing within about a year and a half after introduction. - Changed to allow wiring design based on standardized rules by digitizing wiring routes and know-how. - After about six months of training post-operation start, individuals can independently view drawings and perform wiring tasks. - By integrating data with wire processing machines, manual work has been mechanized, leading to reduced man-hours and improved quality. - Overall quality level of products has also improved.

  • Drawing, tracing, CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ホワイトペーパー_ダイジェスト版_0904.jpg

Control Panel Manufacturing Work Style Reform Guidebook for the Next 5 to 10 Years

Even if you understand the necessity of work style reform, what exactly should you do? Here are hints for work style reform in control panel manufacturing that you should focus on in the future, as seen in successful examples!

We are currently offering a free guidebook for those considering reforming the way control panel manufacturing works, with an eye toward the next 5 to 10 years, to help you find the starting point for your reforms! This digest version introduces general challenges in control panel manufacturing, points that can be resolved through standardization and labor-saving by utilizing IT, and examples of companies that have actively engaged in reforms and achieved results. [Contents] ■ Challenges faced by various panel manufacturers ■ Points that can be resolved by utilizing IT ■ Advanced examples of work style reform *For more details, please refer to the PDF document. Feel free to contact us with any inquiries.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ホワイトペーパー_設計編_1013.png

Starting Now! Control Panel Manufacturing Work Style Reform Guidebook [Design Edition]

Even if you understand the necessity of work style reform, what exactly should you do? Here are hints for work style reform in control panel manufacturing that should be addressed in the future, as seen in successful examples!

We are currently offering a free guidebook for those considering reforming the way control panel manufacturing works, looking ahead to 5 and 10 years from now, to help you find starting points for reform! In this design section, we introduce the challenges faced by the design department in control panel manufacturing, points that can be resolved through standardization and labor-saving by utilizing IT, and case studies of companies that have actually undertaken reforms and achieved results. [Contents] ■ Challenges faced by the design department ■ Points that can be resolved by utilizing IT ■ Integrated database-type CAD that will become mainstream in the future ■ Case studies of work style reform in the design department ■ Features of the control design and power distribution panel design CAD 'ECAD DCX' *For more details, please refer to the PDF document. Feel free to contact us with any inquiries.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ホワイトペーパー_調達編_1023.png

Starting now! Control Panel Manufacturing Work Style Reform Guidebook [Procurement Edition]

Even if you understand the necessity of work style reform, what exactly should you do? Here are hints for work style reform in control panel manufacturing that you should tackle in the future, as seen in successful case studies!

We are currently offering a free guidebook for those considering reforming the way control panel manufacturing works, with an eye towards the next 5 to 10 years, to help you find starting points for reform! In this procurement edition, we introduce the challenges faced by the procurement department in control panel manufacturing, points that can be solved through standardization and labor-saving by utilizing IT, and examples of companies that have successfully undertaken reforms and achieved results. [Contents] ■ Challenges faced by the procurement department ■ Points that can be solved by utilizing IT ■ Integrated database-type CAD that will become mainstream in the future ■ Case studies of work style reforms in the procurement department ■ Features of the control design and power distribution panel design CAD 'ECAD DCX' *For more details, please refer to the PDF materials. Feel free to contact us with any inquiries.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ホワイトペーパー_製造編_1210.jpg

Starting now! Control Panel Manufacturing Work Style Reform Guidebook [Manufacturing Edition]

Even if you understand the necessity of work style reform, what exactly should you do? Here are hints for work style reform in control panel manufacturing that you should focus on in the future, as seen in successful case studies!

We are currently offering a free guidebook for those considering a reform in the way control panel manufacturing operates, looking ahead to the next 5 to 10 years, to help you find the starting point for your reforms! In this manufacturing edition, we introduce the challenges faced by the manufacturing department in control panel production, points that can be resolved through standardization and labor-saving by utilizing IT, and examples of companies that have actively engaged in reforms and achieved results. [Contents] ■ Challenges faced by the manufacturing department ■ Points that can be resolved by utilizing IT ■ Data integration between the upcoming mainstream integrated database-type CAD and the manufacturing department ■ Case studies of work style reforms in the manufacturing department (1) & (2) ■ Features of the manufacturing support system 'WIRE CAM DX' *For more details, please refer to the PDF document. Feel free to contact us with any inquiries.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ECAD導入事例:日栄電機株式会社様_ページ_1.png

ECAD DCX Implementation Case Study <Nihon Eidenki Co., Ltd.>

Introducing a case where transitioning from general-purpose CAD has improved drawing quality and productivity, while also reducing stress for the staff!

We will introduce the issues that were challenges at Nichei Electric Co., Ltd., a manufacturer of control panels/distribution boards, and the points and effects that were resolved through the introduction of the CAD for control design and distribution board design, 'ECAD DCX.' ■ Background of Introduction - The previous general-purpose CAD required transcription to 100 files for 100 pages, resulting in a significant amount of labor beyond design. - Although an add-on software for electrical design for general-purpose CAD was introduced, it was difficult for us to register the vast amount of component data on our own, leading to operational challenges. - Picking components from paper drawings took a full day of work and resulted in many mistakes. ■ Reasons for Adopting ECAD DCX - After hearing from other companies at a seminar that they had achieved efficiency in panel manufacturing using ECAD, we decided to introduce ECAD DCX to reduce design labor, prevent mistakes, and improve overall efficiency through production collaboration. ■ Effects After Introduction - We can now perform transcription, modifications, PDF output, and printing all at once, significantly reducing labor outside of design. - The automatic creation of various forms has greatly reduced the labor and mistakes associated with component procurement. - With user-oriented support services for implementation, we smoothly began using the system, resulting in improved drawing quality and productivity, as well as reduced stress for the staff involved.

  • Drawing, tracing, CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ECAD導入事例:タカシマエンジニアリング様_ページ_1.png

ECAD DCX Implementation Case Study <Takashima Engineering Co., Ltd.>

We will introduce examples of business efficiency improvements from design to procurement and manufacturing, as well as adaptations to changes during times of material shortages!

At Takashima Engineering Co., Ltd., a manufacturer of control panels and power distribution panels, we will introduce the challenges faced until now and the points and effects that were resolved through the introduction of the CAD for control design and power distribution panel design, 'ECAD DCX.' ■ Background of Introduction - The drawing methods were dependent on individuals due to individual design rules, resulting in inconsistencies in the drawings. - When arranging hole-processing cabinets with Nitto Kohki's Cabista, it was necessary to create hole processing drawings again for ordering. - Since parts procurement and processing data were manually entered, there were issues with labor and input errors or incorrect orders. ■ Reasons for Adopting ECAD DCX - The collaboration with Nitto Kohki's Cabista, which is equipped in the ECAD series, supported the introduction of ECAD DCX to improve collaboration and operational efficiency from design to subsequent processes. ■ Effects After Introduction - By constructing and standardizing a parts master, know-how has been shared, accumulated, and turned into an asset. - Collaboration with Nitto Kohki's Cabista has reduced man-hours and shortened the time to order. - Since parts lists and processing data can be output from the drawings, manual input labor has been reduced, significantly minimizing incorrect orders. - Even when substituting with different parts due to material shortages, changes to related areas are automatically reflected in bulk, reducing the effort and mistakes in corrections.

  • Drawing, tracing, CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
導入事例_株式会社三葉製作所様_ページ_1.jpg

ECAD DCX Implementation Case Study <Mitsuba Manufacturing Co., Ltd.>

Introducing a case where the transition from ECAD dio to ECAD DCX was completed within six months, along with the establishment of an operational system that improved productivity and reduced workload!

We will introduce the challenges faced by Mitsuba Seisakusho Co., Ltd., a manufacturer of extrusion molding machines and wire coating devices, and the points and effects that were resolved through the introduction of the control design and power distribution panel design CAD 'ECAD DCX'. ■ Background of Introduction - Designed about 150 control panels for in-house products such as rubber extruders and wire coating devices annually. - There was a need to improve the efficiency and labor-saving of design work, as well as enhance quality. - A situation arose where flexible and speedy responses to specification changes were required. ■ Reasons for Adopting ECAD DCX - Although CAD for the machines and devices in use was considered, ECAD DCX was adopted for its rich dedicated features, including the inheritance of the operability of ECAD dio, which was used in conventional electrical design, as well as actual usability, parts management functions, and integration with sheet metal processing machines. - It was determined that a rapid establishment of the design environment was necessary to improve the quality, reliability, and cost performance of in-house products, and support services for the launch were also utilized. ■ Effects After Introduction - The rich features that streamline design and prevent mistakes have improved design productivity and quality. - Standardization of drawings and reduction of maintenance man-hours have been achieved. - Various functions, such as parts list creation, have been utilized, reducing the workload of designers.

  • Drawing, tracing, CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ECAD導入事例:株式会社富井工業所様.jpg

ECAD DCX Implementation Case Study <Tomi Industrial Co., Ltd.>

Reduce drawing time by 20%! By automatically outputting parts list data from drawings, we can reduce ordering mistakes, and by outputting data for sheet metal processing, we can also reduce the man-hours until processing.

With over 70 years of experience, Tomii Engineering Co., Ltd. is a manufacturer of distribution boards, currently handling cubicle-type distribution boards, control panels, distribution panels, terminal boards, and more. 【Trigger for Introducing ECAD DCX】 For 25 years, they had been using a customized general-purpose CAD, but they considered changing systems when development and support ended. The decrease in skilled technicians and the need for recovery through increased productivity were also factors. 【Deciding Factor for Introducing ECAD DCX】 Among several systems, the expectation of reducing design errors through an integrated database and the numerous implementation cases in other panel manufacturers in the same industry were the key reasons for adoption. 【Effects of Introducing ECAD DCX】 ■ By creating design procedure manuals, all designers acquired skills in a short period. ■ The quality of drawings improved due to the integrated database. ■ The establishment of a unique parts master achieved reduced man-hours, fewer mistakes, and standardization.

  • Other CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
ECAD Findia.jpg

Drawing Management System "ECAD Findia"

Centralized management of numerous drawings! A drawing management system that significantly reduces management man-hours.

ECAD Findia is a system that stores drawing files and drawing information created with ECAD products on a server, allowing for efficient management of drawing data. It supports lifecycle management of drawings using commands such as check-in/check-out/approval, revision management of drawing files, and quick file search functions, addressing the efficient use of drawing data and risks such as revision errors. It can also be used in environments where the ECAD main software is not installed, facilitating smooth sharing of drawing information within the company. 【Features】 - Drawing storage and lifecycle management - Quick drawing search - Flexible access permission settings - Management of the latest versions For more details, please contact us or download the catalog.

  • Drawing, tracing, CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
サポート.png

Information about support services for the ECAD series.

Rich parts library and comprehensive support system.

The dedicated CAD software for electrical design, "ECAD Series," offers a support service called 'Support Contract' to minimize the impact on business from unforeseen accidents. By subscribing to this service, you can take advantage of comprehensive support services, including free provision of upgraded versions with added features and improved stability, access to the 'ECAD Customer Support Site' exclusive to ECAD users, training at special prices or for free, and free replacement of faulty protectors and installation media. We recommend subscribing to the support contract so that you can achieve the best results in the best environment.

  • Architectural CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related catalog(11)

WIRE CAM DX Case Study <Dainichi Seisakusho Co., Ltd.> "Even unskilled workers can become immediate assets" Achieving efficiency in panel manufacturing!

WIRE CAM DX Case Study <Dainichi Seisakusho Co., Ltd.> "Even unskilled workers can become immediate assets" Achieving efficiency in panel manufacturing!

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Control Panel Manufacturing Work Style Reform Guidebook [Digest Version] - Looking Ahead to 5 and 10 Years

Control Panel Manufacturing Work Style Reform Guidebook [Digest Version] - Looking Ahead to 5 and 10 Years

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Control Panel Manufacturing Work Style Reform Guidebook [Design Edition] - Looking Ahead to 5 and 10 Years

Control Panel Manufacturing Work Style Reform Guidebook [Design Edition] - Looking Ahead to 5 and 10 Years

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Control Panel Manufacturing Work Style Reform Guidebook [Procurement Edition] - Looking Ahead to 5 and 10 Years

Control Panel Manufacturing Work Style Reform Guidebook [Procurement Edition] - Looking Ahead to 5 and 10 Years

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Control Panel Manufacturing Work Style Reform Guidebook [Manufacturing Edition] - Looking Ahead to 5 and 10 Years

Control Panel Manufacturing Work Style Reform Guidebook [Manufacturing Edition] - Looking Ahead to 5 and 10 Years

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

ECAD DCX Implementation Case Study <Nihon Eidenki Co., Ltd.> Improved Drawing Quality and Productivity by Transitioning from General-purpose CAD

ECAD DCX Implementation Case Study <Nihon Eidenki Co., Ltd.> Improved Drawing Quality and Productivity by Transitioning from General-purpose CAD

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

ECAD DCX Implementation Case Study <Takashima Engineering Co., Ltd.> Achieving operational efficiency by utilizing ECAD-Cabista collaboration.

ECAD DCX Implementation Case Study <Takashima Engineering Co., Ltd.> Achieving operational efficiency by utilizing ECAD-Cabista collaboration.

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

ECAD DCX Implementation Case Study <Tomi Industrial Co., Ltd.>

ECAD DCX Implementation Case Study <Tomi Industrial Co., Ltd.>

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

ECAD DCX Implementation Case Study <Mitsuba Manufacturing Co., Ltd.> Established an operational system in a short period, improving productivity and reducing workload.

ECAD DCX Implementation Case Study <Mitsuba Manufacturing Co., Ltd.> Established an operational system in a short period, improving productivity and reducing workload.

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Drawing Management System "ECAD Findia"

Drawing Management System "ECAD Findia"

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Information about Support Services for the ECAD Series

Information about Support Services for the ECAD Series

OTHER
  • E-book viewing
  • Catalog download

Contact this catalog

Distributors

ECADソリューションズ
Information and Communications
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration
ECADソリューションズ
  • Official site
Phone number/address

news

採用イベント「Kort Valuta Night」11/26開催!

“Kort Valuta Night” Recruitment Event in November — A Chance to Hear Real Voices from Our Team Casually get to know Kort Valuta — several participants have already joined the company after attending!

  • NEW
  • COMPANY

Kort Valuta Inc. (Head Office: Shibuya, Tokyo; CEO: Hideki Shibata) is pleased to announce that we will hold our next recruitment event, “Kort Valuta Night,” on November 26, 2025. This recurring event offers an opportunity for potential candidates to casually learn about our company culture and team atmosphere before applying. By lowering the barrier to entry and providing authentic insights from current employees, the event helps participants gain a more concrete sense of what it’s like to work at Kort Valuta. Since the event’s launch, approximately ten attendees have gone on to join the company in a range of roles — including marketing, customer support, and backend engineering.

Nov 13, 2025

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
デジタル社員証「TwooCa」アプリのUIデザインをリニューアル ~ナビゲーション機能強化とレイアウト最適化で操作性を向上~

TwooCa App — Digital Employee ID — Undergoes UI Redesign ~ Improved usability through enhanced navigation and optimized layout ~

  • NEW
  • PRODUCT

Kort Valuta Inc. (Headquarters: Shibuya-ku, Tokyo; President & CEO: Hideki Shibata; hereinafter “the Company”) announces that it has renewed the user interface (UI) of TwooCa, the Company’s digital employee ID with Visa payment functionality.

Nov 12, 2025

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
株式会社NBSロジソル、全従業員約1,100名を対象に「TwooCa」を導入 ~働きやすさと理念実践を両立する次世代基盤~

NBS Logisol Co., Ltd. Implements “TwooCa” for Approximately 1,100 Employees Visualizing Appreciation, Health, and Challenge — Building a Next-Generation Platform that Enhances Both Work Comfort and Corporate Philosophy Practice

  • NEW
  • COMPANY

Kort Valuta Inc. (Headquarters: Shibuya-ku, Tokyo; CEO: Hideki Shibata) is pleased to announcethat NBS Logisol Co., Ltd. (Headquarters: Hita City, Oita Prefecture; CEO: Itsuro Kono) has introduced “TwooCa,”a Visa-enabled digital employee ID card, for approximately 1,100 employees.

Nov 12, 2025

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

An article about the lightweight resin formwork system 'PERI DUO' has been published in the 'Construction News' (November 7, 2025)!

  • NEW
  • OTHER

An article about the resin-based lightweight formwork system "PERI DUO" has been published in the "Construction News" (November 7, 2025)! "PERI DUO" is a new system formwork made of resin that can be used for walls. It is made from a newly developed material called "Politec," which is high-strength and lightweight. With fewer components, it is easy to handle. It allows for increased reuse and is an environmentally friendly lightweight formwork that is flexible on the construction site! 【DUO Product Features】 ■ New system formwork made of resin ■ High strength and lightweight ■ Fewer components and easy to handle ■ 100% recyclable *For more details about this product, please feel free to contact us. PERI Japan Co., Ltd.

Nov 11, 2025

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The "Kuji Regional Renewable Energy Circulation Project" in Kuji City, Iwate Prefecture, has received an excellence award at the 2025 Solar Week Awards from the Solar Power Association.

  • NEW
  • OTHER

We are pleased to announce that the "Kuji Regional Renewable Energy Circulation Project" in Kuji City, Iwate Prefecture, has received an Excellence Award at the 2025 Solar Week Awards organized by the Japan Photovoltaic Energy Association. The "Solar Week Awards" recognize initiatives and projects that contribute to the community, are desired by the community, and serve as models for the expansion of solar power generation. On July 24, 2025, NGK Insulators, Ltd. issued a press release titled "Start of Operation of Solar Power Generation Equipment at Hybrid Storage Facility with Sharing Function - Ceremony Held at Solar Power Plant Operated by Iwate Bank Group Company." This demonstration of the hybrid storage facility with sharing function (StorageHub) is being conducted by manorda Iwate, a regional trading company fully funded by Iwate Bank, with development led by NR-Power Lab Co., Ltd. NR-Power Lab Co., Ltd. is leading the design, development, and system operation of the StorageHub in this project. We will continue to collaborate with our partner companies to engage in technological development and the creation of advanced services aimed at realizing a sustainable local community.

Nov 11, 2025

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Return to news list
  • 気づかないうちに…著作権侵害してませんか? 著作権に関するご相談はサンメディアまで
  • 入力の手間から解放、リアルな営業活動を蓄積 直感的に使える営業支援システム DRIVE SFA
    • Inquiry about this news

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.