Presentation of Useful Materials for Subsidence Correction Work: Explanation of the Underpinning Method
Not only correct the sinking of the building, but also prevent further sinking! Construction can be carried out while occupied.
The "underpinning method" is commonly used in settlement repair work, where the load of the building is supported by steel pipe piles driven into the foundation using jacks, allowing for the entire building to be corrected. It prevents re-settlement and allows for construction to be carried out while residents remain in the building, without the need to move out. There is minimal noise, vibration, and dust generation, and the space required for equipment storage is also minimized. 【Features】 ■ The load of the building is supported by steel pipe piles driven into the foundation using jacks, correcting the entire building. ■ Construction can be carried out while residents remain in the building, without the need to move out. ■ Minimal noise, vibration, and dust generation. ■ Space-efficient equipment storage. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Flow of Steel Pipe Pile Driving Method】 (1) Preparation Work (2) Demolition Work (3) Excavation Work (4) Settlement Correction Work (5) Steel Pipe Pile Driving Work (6) Backfilling and Root Wrapping (7) Repair Work *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company focuses on two main areas: the environmental sector, which specializes in soil contamination surveys and soil remediation construction, and the housing renovation sector, which centers on housing inspections and foundation repair work. In both areas, we are committed to complying with laws and regulations while diligently striving to uphold the interests of our clients and our social responsibilities. If you have any concerns regarding soil or ground issues, please feel free to contact us! ■ Ministry of the Environment designated investigation agency, Environment 2016-3-0002 ■ Construction and civil engineering business, Chiba Prefectural Governor's license (General-29) No. 33073 ■ Well drilling business, Chiba Prefectural Governor's license (General-29) No. 33073