It is possible to install bridge piers under strict construction restrictions such as upper limits, lateral limits, and front limits.
The "Lift-Up Horizontal Rotation Construction Method" involves lifting up the pier and beam section, and then rotating it horizontally after connecting it to the columns. This method allows for the installation of piers under elevated bridges in construction conditions where there are strict limitations above, to the sides, and in front, such as those found in areas squeezed between roads. Please feel free to contact us if you have any inquiries. 【Features】 ■ Construction can be done with low noise ■ Significant reduction in traffic restrictions ■ Reduction of high-altitude work is possible ■ Shortening of construction period is possible *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Process】 1. Installation of beams and corners 2. Lift-up 3. Insertion of columns 4. Joining of columns 5. During rotation 6. Rotation completed *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment, we have contributed to society by providing technologies that always meet the needs of the times. We have expanded our business scope, starting with the manufacturing of transmission towers, to include three-dimensional structures, special steel frames, building steel frames, bridges, and comprehensive construction. In order to achieve "social contribution by expanding urban functions that allow people to lead richer lives through our business activities," we will respond to our customers' needs by combining the know-how we have cultivated over many years with advanced technology. Please feel free to contact us if you have any requests.