Using genetic algorithms, we will automatically create plans for stacking and unstacking.
● Main Features of the Sakura Scheduler ・Advanced optimization logic (Lagrangian relaxation method, genetic algorithms) ・Support for flexible production environments ・Overall optimization scheduling ・Optimization that also reduces setup time ・Scheduling that reflects actual performance ・Input and output using Excel (CSV)
Inquire About This Product
basic information
● Constraints handled by the Sakura Scheduler - Machine constraints: Calendar settings can be configured for each machine. Supports automatic operation machines with setup and return settings. - Personnel constraints: Calendar settings can be configured for each personnel. It is possible to set up configurations that require personnel only for preceding and following setups plus fixed times. Accommodates fluctuations in personnel throughout the day. - Tool (jig, mold) constraints: If a jig is broken, it is possible to reduce the number of available jigs. - Precedence constraints - Raw material arrival time constraints 【Price Range】 98,000 yen (can be installed on any number of computers for one company) *Additional costs will be incurred if training and implementation support are required.
Price range
P2
Delivery Time
Applications/Examples of results
【Sakura Scheduler Suitable Production Environment】 - Make-to-order and mixed production environments It can be accommodated by setting the planned date in the production management system to the delivery date, even in forecast production. - Individual or lot production environments Supports discrete production environments. Not suitable for process production environments like chemical products. - Both processing and assembly production environments In assembly production environments, automatic generation of in-house parts jobs using the bill of materials (BOM) is possible. It automatically performs required quantity expansion and outputs a list of necessary materials.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in manufacturing, such as revenue enhancement, productivity improvement, lead time reduction, and inventory reduction, including the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create customized original programs tailored to each company's management challenges, addressing everything from "on-site improvements" to "system improvements" and "production innovation," and provide appropriate solutions. If you encounter any issues that need to be addressed, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astech Consulting HP] https://www.ast-c.co.jp/