Introducing the features of our TNF method, which can shorten construction time by 50% compared to conventional methods!
We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 successful projects nationwide. We carry out ground improvement to create an artificial bedrock suitable for buildings on soft ground across the country. Compared to conventional methods, there is no need for pile work, formwork, or foundation work, allowing for a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1,000 m² and pile length of 30 m) ■ No piles are used, which also reduces demolition costs when dismantling buildings *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【Recommended for the following】 ■ Design firms ■ General contractors ■ Companies that need commercial stores or logistics warehouses ■ Clients planning factories, warehouses, or stores on weak ground requiring pile foundations *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Alternative to pile foundations in construction *For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We have been in the construction business for over 100 years, based in Ishikawa Prefecture.