Introducing examples from a hardball baseball field in Kanagawa Prefecture and a chimney at a power plant in Yamaguchi Prefecture!
We would like to introduce examples of the adoption of our "Nice Pole/Slip Form Method." In the renovation project (demolition and new construction) of an existing baseball stadium by Kawasaki City, a protective net pole was installed above the stands, reaching a height of approximately 30 meters above ground. This project is a two-phase construction, which includes the manufacturing and installation of the poles and the stretching of the nets. Additionally, in the construction of an RC chimney at a coal-fired power plant, we adopted the "Slip Form Method," which is a safe and labor-saving method that allows for continuous construction of concrete walls. The chimney has a height of 165 meters, and the structure was constructed at a pouring height of approximately 2 meters per day. 【Case Overview】 <Nice Pole> ■Location: Kanagawa Prefecture, Todoroki Hardball Baseball Stadium ■Details: Protective net pole installed above the stands, with a height of approximately 30 meters above ground. <Slip Form Method> ■Location: Yamaguchi Prefecture, T Power Plant Chimney ■Details: The chimney height is 165 meters, constructed at a pouring height of approximately 2 meters per day. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
JFE Civil Corporation has been developing its business in various fields based on its track record and technical expertise in maintaining JFE Steel's steelworks for many years. We deliver valuable business from planning to construction and maintenance support. We are the only comprehensive construction company in the JFE Group.