We will introduce the construction method of Shinetsu Patch Seal, which is effective for corrosion prevention and waterproofing in the architecture and civil engineering fields.
<Construction Method> 1. Pre-construction Adjustment The surface for laying the Shinetsu patch seal should be prepared by performing two types of scraping and washing with water to adjust the substrate. * Please confirm that the surface to be adhered is completely dry before construction. 2. Preparation of Shinetsu Patch Seal Dimension adjustments can be made on-site using a cutter. After cutting, remove the separator film. 3. Application of Shinetsu Patch Seal Carefully apply the sheet without stretching it from top to bottom. After application, press the sheet with your hand to ensure it adheres well to the surface. The overlap width should be at least 20 mm, and secure it with tape as described in step 4. 4. Seal with Patch Tape Transparent to Complete Place the patch tape transparent over the edge of the patch seal and the substrate while it is still attached to the separator film, and press it down using a roller or similar tool over the separator film. After that, gently peel off the separator film in a 180-degree direction. Please use it up within 30 minutes after opening the package.
Inquire About This Product
basic information
Urgent measures for water leakage due to aging of structures! A product that excels in reducing repair work time and durability. *For more details, please refer to the catalog.
Price information
Please contact us regarding the delivery price to your company.
Delivery Time
Applications/Examples of results
*For more details, please refer to the catalog.
catalog(4)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.