The construction period is 2 days, and it will be carried out using BASF MasterTop 1430! A case study of floor coating and U-Crete method.
We would like to introduce a case where we received a request for the construction of a rice cracker factory (confectionery packaging line) in Nagaoka City, Niigata Prefecture. The construction was carried out using "BASF MasterTop 1430." The key point of this construction is the complete protection of the machinery. The substrate preparation involved the complete removal of the old coating using a large grinding and polishing machine. No matter how excellent the paint used is, if any of the previous coating remains or if there are issues with the construction method, the benefits of the paint cannot be maximized. If you are facing any issues with floor construction in your building, please consult Asahi Coating first. 【Case Overview】 ■ Nagaoka City, Niigata Prefecture - Rice Cracker Factory Floor Coating ■ Floor Coating Method ・BASF MasterTop 1430. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Our company specializes in flooring construction, including the U-Crete method. We have extensive experience in projects at factories, commercial facilities, and public facilities, allowing us to understand our customers' needs and propose appropriate construction plans. For flooring that requires heat resistance, durability, and mold resistance, please leave your U-Crete method and flooring construction concerns to us.