Significantly improve work efficiency! It is possible to lower long pipes horizontally while maintaining the safety of the earth retaining structure!
The "Swing Panel" is a panel for earth retention used in pipeline installation. Since installation and removal work can be done at ground level, it is possible to avoid risks of personal accidents. By swinging the aluminum hydraulic cylinder, it becomes possible to lower long pipes horizontally while maintaining the safety of the earth retention, significantly improving work efficiency. 【Features】 ■ Uses aluminum hydraulic cylinders for the strut, allowing for swinging in just a few seconds ■ By swinging the strut, it is possible to lower long pipes horizontally ■ Installation and removal work can be done at ground level, allowing for the avoidance of risks of personal accidents *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Specifications (Partial)】 <SPSW-E3020 (Shallow Digging Type, Basic Panel [Aluminum Specification]) ■ Length: 3,000mm ■ Height: 2,000mm ■ Thickness: 50mm ■ Weight: 410kg ■ External dimensions of the panel: Cylinder dimensions + 280mm *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Only what is necessary, when it is necessary, for better products. By eliminating the enormous costs of 'ownership,' we maximize the utility of 'usage.' I am convinced that the most efficient system is 'rental.'