Installed alongside a solar power generation system! Introduced for peak cutting during normal times and BCP measures during power outages.
We would like to introduce a case where the industrial and grid energy storage system "TAMERBA" was implemented in Yamaguchi City, Yamaguchi Prefecture. In developing and constructing the energy storage system utilizing reused EV batteries, Nishimu was responsible for the design, procurement, and construction of the energy storage system. The energy storage system is installed alongside a solar power generation system and was introduced for peak cutting during normal times and as a BCP measure during power outages. 【Case Overview】 ■ Energy Storage System: 250kW output + approximately 1MWh capacity ■ Yamaguchi City, Yamaguchi Prefecture ■ Construction completed in 2021 ■ Energy storage system utilizing reused EV batteries ■ Nishimu was responsible for the design, procurement, and construction of the energy storage system *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Nishimu Electronics Industry has been striving for constant improvement since its founding in 1963, anticipating the changes of the times and the trends of scientific and technological advancement. Today, we have grown into a "comprehensive engineering service company" that utilizes diverse technologies and abundant experience in the fields of electronic communication and monitoring control to provide our customers with the optimal IT environment. Additionally, as a member of the Kyushu Electric Power Group, we are always committed to being recognized as a trusted best partner by our customers, the local community, and our business partners in our corporate activities.