Rapid construction is being adopted one after another! Once the foundation work is completed, all you need to do is set it on the base!
The "Rubber Capstone" is a drainage system that combines polymer concrete and rubber. There is no need for cumbersome tasks such as concrete formwork, block laying, or reinforcing bars. The construction period is just one day, and it is currently attracting significant attention as a sandpit frame for athletic fields, schools, kindergartens, and parks. 【Features】 ■ Easy to install ■ Durable and safe ■ Shortens construction time ■ Lightweight design *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Construction Procedure】 ■STEP 1: Secure the base ■STEP 2: Stand the product up and firmly connect the foundation with mortar ■STEP 3: Construction completed, in just one day for a 20m x 20m sandpit ■STEP 4: Fill with sand, sandpit construction completed *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Acoustic Co., Ltd. is the exclusive distributor of ACO, a company that originated in Germany, in Japan. ACO products, which have gained overwhelming market share and trust in Germany, are now recognized worldwide for their quality and have expanded into cities around the globe. Currently, the company operates in over 40 countries and regions, continuously increasing its market share worldwide. The drains that landed in Japan in 1995 have been adopted in places such as the Ibaraki Prefectural Office and Roppongi Hills. Products created under strict EU quality control standards are unparalleled and have garnered overwhelming trust and support in Japan as well.