A method to reduce the intermediate piles of temporary earth retention, simplifying the pile driving work and the erection and dismantling of struts.
The "Eco Lam Method" is a construction technique that reduces the number of intermediate piles by using columns (square steel pipes) with high buckling performance. In conventional methods, intermediate piles are necessary, which requires creating floor openings at the intermediate pile locations during the concrete slab pouring. This necessitated additional reinforcement for the openings, the installation of formwork for the openings, and sealing the openings after the construction was completed. With this method, the reduction of intermediate piles eliminates the need for such ancillary work. 【Features】 ■ Improved structural quality ■ Shortened construction period ■ Enhanced safety ■ Increased work efficiency ■ Improved cost-effectiveness *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Applicable Sites】 ■ One-way beam cutting plan ■ Construction of intermediate pile driving and removal, sites with high costs *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our group is engaged in the supply of materials and construction focused on temporary retaining walls for essential underground foundation work in large infrastructure projects such as buildings and roads that support our daily lives. In the future, we will expand our operations into related businesses and establish a system to undertake comprehensive underground construction projects. Please feel free to contact us if you have any requests.