We support direct installation and replacement with reduced construction time and costs! The rise of the finished surface is 8mm.
We offer "floor renovation" services that keep construction time and costs down. We grind the existing flooring or remove carpets and vinyl sheets, and then directly install new flooring on top. Our UV fine ceramic coating finish is designed for foot traffic and boasts excellent abrasion resistance. 【Features】 ■ Direct installation of flooring ■ Construction time as short as 1 day per classroom ■ The rise of the finished surface is 8mm ■ Foot traffic compatible with excellent abrasion resistance from UV fine ceramic coating *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Construction Procedure】 ■ Grinding of existing floor and installation of Paste 8 - Existing floor → Grinding work → Installation work → Installation completed ■ Carpet removal, substrate adjustment, and installation of Paste 8 - Existing floor → After removal → Installation work → Installation completed *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company has been manufacturing flooring that is comfortable to live in, moisture-resistant, and durable, using not only domestic materials but also carefully selected wood from Southeast Asia and North America, based on years of rich knowledge and experience. Please feel free to contact us if you have any inquiries.