We will finish the drilling neatly when installing the saddle-type water supply valve.
This is a drill for making a hole (perforation) in the main water pipe when installing a saddle-type water supply valve at the branch of the water supply pipe. ◎ Beautiful finish without chips ◎ Available for PE pipes and PVC pipes
Inquire About This Product
basic information
■For PE pipes (polyethylene pipes) φ20, φ25 ■For PVC pipes φ20, φ40
Price information
Rentals are available in a minimum unit of 1 day (with a minimum guarantee of 3 days). You can set the usage period according to your needs.
Delivery Time
Applications/Examples of results
Drilling of the main pipe when installing a saddle-type branch valve.
Detailed information
-
It is a push-cut type with a hole saw drill that produces no chips, resulting in very cleanly finished perforation holes.
-
The slice can be easily refurbished without removing the drill using the slice extrusion rod. There are no chips remaining inside the pipe.
Line up(4)
Model number | overview |
---|---|
PHD20 | Handheld drill for PE pipes φ20 |
PHD25 | Handheld drill for PE pipes φ25 |
― | Handheld drill for VP φ20 |
― | Handheld drill for VP φ40 |
catalog(1)
Download All CatalogsCompany information
Since our establishment, we have been contributing to the rationalization and management efficiency of our customers through the rental business of construction machinery and industrial vehicles. Currently, we are not limited to construction machinery; we also respond to a wide range of needs in general industrial machinery, logistics machinery, environmental maintenance machinery, maintenance machinery, and more, while actively making proposals to ensure customer satisfaction. Through "rental," we aim to alleviate your burdens as much as possible, and we will continue to pursue and provide what our customers truly need and what systems are genuinely necessary.