FCR Emergency Measures Construction Method [FCR Method Association]
FCR Emergency Measures Construction Method FCR Method Association
Immediate emergency measures after the investigation.
When conducting an investigation of railway drainage facilities (fukubi, fusebi, fukeburi), if there are significant deformations and a risk of subsidence, prompt FCR emergency measures will be taken. Water flow will be secured to prevent track bed subsidence. Due to the compact nature of the repair equipment, repairs can be made in any location. *For more details, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
【Features】 1. The FCR construction vehicle is a 2-ton vehicle, making it easy to approach the site. 2. Equipment can be unloaded from the construction vehicle for remote repairs. 3. Construction completion time is 2 business days. ● For more details, please contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.