No special large machinery is required; construction can be done in a small space.
The FCR3S segment method does not require large machinery and enables the repair of large-diameter buried pipes and bridges in small spaces. *For more details, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
【Features】 1. No special large machinery required 2. Lightweight due to being made of plastic, making installation easy 3. Partial repairs are possible ● For more details, please contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.



![[Renovation Case of Wooden Facilities] Banna Park Firefly Waterfall Stairs](https://image.www.ipros.com/public/product/image/0e4/2000303414/IPROS4197506721108005614.jpg?w=280&h=280)

![Glass sliding door component [with lock hole and receiver hole hakama] <Stainless Steel SUS304>](https://image.www.ipros.com/public/product/image/47c/2001235170/IPROS88755665487055750994.png?w=280&h=280)


