Achieve weight reduction and shortened lead times! Please consider this as material for VE VA proposals.
The process for conventional materials (SCM or FCD450) was primary processing → heat treatment → heat treatment → grinding. The process for the new material (cast high-strength cast iron 800) is casting → final finishing. This achieves weight reduction and shortened lead times, allowing for an 8% weight reduction compared to steel with the same shape. Please consider this as a material proposal for VE VA. 【Features】 ■ Process for the new material (cast high-strength cast iron 800) - Casting → final finishing ■ Achieves weight reduction and shortened lead times ■ Allows for an 8% weight reduction compared to steel with the same shape *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Specifications】 ■Material: Iron, Steel, Assembled Products ■Lot: 1,000 to 10,000 pieces ■Accuracy: Within general tolerance range *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Industry】 ■Automotive (Prototype) ■Automotive (Mass Production) ■Automotive Electrical Components *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company primarily manufactures and sells gas, water, and other plumbing fittings, as well as building and industrial machine parts, and engages in prefabricated piping processing. We handle fittings for general water supply, hot water, air conditioning piping, and gas piping, as well as ductile iron products. We are committed to constantly understanding societal needs, developing unique products, and improving quality.