We will introduce a foundation pile installation method that can be carried out with low noise and low vibration.
This technology is a foundation pile embedding method that demonstrates its effectiveness in unstable ground, such as gravel layers in the intermediate layer. First, a large auger screw is used for the first excavation based on the pile diameter, while simultaneously injecting cement milk and mixing it to solidify the excavation hole. After allowing some time for solidification, a second excavation is performed, and root-fixing milk and surrounding stabilizing liquid are injected to embed the pile. 【Features】 ■ Effective in unstable ground ■ Increased bearing capacity ■ Can be constructed with low noise and low vibration *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Construction Sequence】 1. Forward excavation 2. Excavation to planned depth 3. Hoisting 4. Temporary excavation completed 5. Secondary excavation 6. Hoisting 7. Secondary excavation completed 8. Pile insertion 9. Completion *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company has been engaged in foundation work for large buildings and condominiums, developing trust and a proven track record in the industry. We place great importance on a technology-focused approach and, while taking on challenging construction projects, we are building the foundations for future towns.