It has a "fail-safe function" to maintain safety and a "fail-sensor function" to visualize internal abnormalities!
The "Tail Alme FS" is a construction method that allows for the safe visualization of abnormalities within embankments through fail-safe and fail-sensor functions, moving beyond the previous approach of determining abnormalities based solely on surface information. The "fail-safe function" ensures that if the function of the targeted component is lost, a separate component that is not active during normal conditions will take over, preventing any impact on the reinforced soil wall. The "fail-sensor function" visualizes abnormalities within the Tail Alme embankment. 【Features】 ■ Technology aligned with the basic plan for infrastructure longevity promoted by the Ministry of Land, Infrastructure, Transport and Tourism (H25) ■ Received the Excellence Award at the 3rd Infrastructure Maintenance Awards ■ Among similar maintenance management technologies, it has a simple structure that does not require power sources ■ Construction and durability are comparable to standard Tail Alme systems *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Fail Sensor Function Features】 ■ Prevents sudden wall detachment, etc. ■ Simplifies and facilitates inspections (Inspection of invisible strips can be performed during wall inspections) ■ Allows for investigation, countermeasure consideration, and action while ensuring safety even after FS Connective A is disconnected *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
"JFE Shoji Tail One" will establish a sales system with sales engineers who possess both sales capabilities and technical knowledge, as well as design know-how, to further promote the highly reliable Tail Arm method as a "pioneer in reinforced soil." This will enhance the provision of detailed technical services, allowing us to flexibly respond to the increasingly diverse nature of public works in the future and accurately meet various needs.