Earth drill type enlarged base pile method that pursues environmental conservation and shortened construction period!
The "ECO-ACE Method" is a type of enlarged base pile method that allows for the entire excavation process, including the enlargement, to be carried out using the earth drill method. It can accommodate a maximum enlarged base diameter of 4.1m (construction diameter). It can be combined with the shaft excavation using three types of cast-in-place piles (earth drill, reverse, all casing). 【Features】 ■ Uses a Remo pump (mixing type slime removal pump) to extract slime ■ Improves the stable liquid to a sand content of less than 1% using a bentonite plant (sand separation device) equipped with a cyclone, ensuring reliable liquid replacement ■ Easy management of enlarged base excavation construction and reliable processing of the enlarged base *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Sequence】 1. Set pile core 2. Surface layer excavation 3. Casing installation 4. Injection of stabilizing fluid into the shaft 5. Shaft excavation 6. Base widening excavation 7. Primary slime treatment 8. Hole wall measurement 9. Insertion of rebar cage and tremie pipe 10. Secondary slime treatment 11. Concrete placement 12. Removal of tremie pipe 13. Removal of casing *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company undertakes pile construction projects using the earth drill type enlarged base pile (ECO-ACE method) as well as excavation support work. In addition, we also sell cement and ready-mixed concrete. Please feel free to contact us.