We achieve cost reduction without using specially shaped piles or construction machinery!
The "Hyper-Straight Method" is a simple method for straight excavation and straight piles that has evolved further based on the experience gained from the HIT method, BESTEX method, and FP-BESTEX method. The piles used are standard straight piles (such as PHC, PRC, SC) and enlarged head piles, and no special-shaped piles are used. It exhibits approximately 1.5 times the bearing capacity performance compared to the old construction minister certified method (old Article 38 certification), contributing to a reduction in the number of piles used and achieving cost savings. 【Features】 ■ Reliable construction with stability ■ Simple and highly versatile ■ High bearing capacity, effective for cost reduction *For more details, please download the PDF or contact us.
Inquire About This Product
basic information
【Construction Procedure】 1. Set pile center / Excavation and mixing 2. Injection of solidification liquid / Construction of solidification section 3. Injection of surrounding fixation liquid / Construction of surrounding fixation section 4. Insertion and installation of piles *For more details, please download the PDF or contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Examples】 ■ Special Nursing Home in Takaracho, Katsushika Ward, Tokyo ■ Self-Driving Multi-Story Parking Garage at the City Hall in Inuyama, Aichi Prefecture ■ Harue Community Center in Harue Town, Sakai City, Fukui Prefecture *For more details, please download the PDF or contact us.
catalog(1)
Download All CatalogsCompany information
Our company has developed reasonable and efficient products and construction methods based on our industry-leading technological development capabilities and track record. We respond to various conditions such as customer requests, geological conditions, and surrounding environments without being constrained by past achievements. Please feel free to contact us with your inquiries.