Road Upcon Method (Concrete Pavement Slab Repair Method)
We will repair various defects that occur in concrete pavement slabs within a short construction period.
New Technology from Upcon Contributing to the Longevity of Road Infrastructure Upcon quickly corrects defects that occur in concrete pavement slabs: - Elimination of step differences - Correction of subsidence - Resolution of fluttering - Elimination of voids and cavities - Restoration of water drainage gradients - Correction of subsidence in bearing plates For repairs on highways and other surfaces requiring high strength, we use a uniquely developed high-strength polyurethane resin to correct concrete pavement slabs in a short time. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
**Features of the Upcon Method** Solves various deformations in a short construction period without breaking the concrete pavement slabs. - **Short Construction Period** Compared to replacing concrete pavement slabs, the construction period is reduced to 1/10. - **Enables Early Traffic Opening** Achieves a compressive strength of 1.2 MPa for polyurethane resin after 2 hours. - **Eliminates Subgrade Loosening** Improves the surface subgrade beneath the concrete pavement slabs to suppress the occurrence of deformations. - **Compact Construction Package** All necessary equipment, including materials, injection machines, and compressors, is loaded onto a 4-ton truck. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
■Construction Achievements Factories, Warehouses, Logistics Centers Stores, Commercial Facilities Roads, Airports, Ports, Tunnels Flat Foundation Houses Schools, Hospitals, Nursing Facilities Many other achievements are available. Total number of construction projects exceeds 1,800. *For more details, please refer to the PDF document or feel free to contact us.
catalog(9)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 1] Kanmon Tunnel Concrete Pavement Slab Void Filling Work](https://image.www.ipros.com/public/catalog/image/01/67d/652383/IPROS18287232451842893111.jpg?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 2] Joban Expressway Nagareyama IC Restoration and Repair Work](https://image.www.ipros.com/public/catalog/image/01/d1a/652747/IPROS13288921954826130650.jpg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 2] Onagawa Fishing Port Miyagazaki Quay Disaster Recovery Project](https://image.www.ipros.com/public/catalog/image/01/f20/647656/IPROS5098479422774090087.jpg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 3] Repair Work for Port Facilities: Correction of Subsidence on RTG Travel Path](https://image.www.ipros.com/public/catalog/image/01/359/723873/IPROS56912473679892218552.jpeg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 4] Sendai Shiogama Port (Ishinomaki Area) Hibari-no Chuo Pier Quay Disaster Recovery Work](https://image.www.ipros.com/public/catalog/image/01/6e4/734399/IPROS3107554405782613509.jpeg?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.