Ensuring the specified permeability performance! It is also used as filling mortar for impermeable walls using methods such as the CD method.
The "Ace Sand Method" was realized and started in 1986 with the idea that "bubbles can be used to pump mountain sand." The pumping of mountain sand, which is prone to material separation, was made possible by continuously mixing while pumping. Additionally, it utilizes locally generated soil (especially sandy soil), mountain sand, recycled sand, and improved soil, mixing them with solidifying agents, water, and bentonite to ensure the required permeability performance, and is also used as filling mortar for impermeable walls through methods such as the CD method. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The adoption of lightweight fill (FCB method) and backfilling methods using fluidized treated soil is increasing. Applications are expanding to include reduction of settlement on soft ground, load reduction on landslide-prone slopes, reduction of soil pressure on structures, backfilling in difficult areas, prevention of consolidation settlement, ground improvement, and liquefaction countermeasures.