Ground improvement / Construction of large-diameter cylindrical improvement bodies using the 'SUPERJET method'
Create large-diameter cylindrical improved bodies. Four types can be set according to construction purposes and conditions, with maximum effective diameters of Ø2.5m, Ø3.5m, Ø5.0m, and Ø6.0m.
The SUPERJET method involves cutting the ground by horizontally injecting ultra-high-pressure solidifying material accompanied by air from a rotating double-pipe rod, while simultaneously discharging slime to the surface and creating large-diameter cylindrical improvement bodies. 【Applications】 ● Improvement of the base during excavation and pre-placed underground beams ● Prevention of subsidence in newly constructed roads ● Shield launch and arrival protection ● Reinforcement of tunnels ● Strengthening of water-stopping in gaps of retaining walls ● Liquefaction countermeasures 【Features】 ● Capable of accommodating a wide range of soil types. Four types can be set with maximum effective diameters of Ø2.5m, Ø3.5m, Ø5.0m, and Ø6.0m to meet construction purposes and conditions. ● Excellent adhesion to retaining walls and structures. ● Achieves high-speed construction by utilizing powerful energy. ● Uses cement-based solidifying materials, providing excellent durability. ● By cutting the same location twice with one rotation, it allows for good mixing and stirring, resulting in high-quality improvement bodies.
Inquire About This Product
basic information
【Construction Procedure】 1. Installation of Guide Hole Drilling to the specified depth 2. Installation of SUPERJET Rod installation, injection of ultra-high pressure jet, rotation of the monitor 3. Raising the Monitor While maintaining the state of step 2, raise the monitor and discharge the slime For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Applications】 ● Improvement of the base during excavation / Pre-embedded underground beams ● Prevention of subsidence for newly constructed roads ● Shield launch and arrival protection ● Reinforcement of tunnels ● Water stop reinforcement for missing sections of retaining walls ● Liquefaction countermeasures
Company information
Since its establishment, our company has played a role in national construction, primarily focusing on the "ground improvement field" with our unique grouting method. Subsequently, in response to the changes in social infrastructure development, we have refined our technologies to adapt to the needs of the times and, at times, acquired new ones to expand our business scope. As a result, we have now established three main pillars: "ground improvement business," "slope disaster prevention business," and "pipeline business."