Remote and self-propelled technology for investigating the main sewer line: "TV Camera Inspection System"
It is possible to conduct a preliminary investigation using a self-propelled camera video to assess cracks, damaged areas, and defective sections of the installation pipes that have occurred within the sewer pipeline when making decisions about construction feasibility and method selection.
By conducting a preliminary survey using a TV camera before rehabilitating the pipeline, it is possible to identify steps, deflections, and surface cracks within the pipe, allowing for the selection of appropriate construction methods. Applicable pipe types: Reinforced concrete pipes, ceramic pipes, PVC pipes, FRPM pipes, steel pipes, polyethylene pipes Applicable pipe diameter: Ø150 and above Construction length: Up to approximately 100m 【Applications】 ● Visual inspection of small-diameter pipelines ● Diagnosis of pipeline aging ● Records before and after pipeline rehabilitation work ● Verification of inconsistencies with management ledgers 【Features】 ● Recording the condition inside the pipe makes it easy to create documentation. ● The equipment is designed to be assembled on-site, making maintenance, storage, and transportation easy. ● The survey conducted by the machine allows for the acquisition of highly accurate data. ● Surveys can be conducted via remote control.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ● Visual inspection of small-diameter pipelines ● Diagnosis of pipeline aging ● Records before and after pipeline rehabilitation work ● Verification of inconsistencies with management ledgers
catalog(1)
Download All CatalogsCompany information
Since its establishment, our company has played a role in national construction, primarily focusing on the "ground improvement field" with our unique grouting method. Subsequently, in response to the changes in social infrastructure development, we have refined our technologies to adapt to the needs of the times and, at times, acquired new ones to expand our business scope. As a result, we have now established three main pillars: "ground improvement business," "slope disaster prevention business," and "pipeline business."