By rehabilitating the existing main pipe, connection pipe, and connection pipe joints with light curing, it is possible to achieve a uniform and seamless strong integration rehabilitation of the main pipe and connection pipe.
The seamless system construction method allows for the rehabilitation of existing main pipes, service pipes, and service pipe joints, enabling a strong integration rehabilitation of the main and service pipes. Additionally, the rehabilitated pipes use light-curing resin that hardens reliably when exposed to light (ultraviolet), providing performance equivalent to new pipes. It can accommodate main pipes with diameters ranging from Ø200 to 800 mm (self-supporting pipes from Ø200 to 600 mm). There are two types available: standard and fast-curing. **Features** - Uniform and reliable curing of rehabilitated pipes made possible by light. - The evolved seamless system leads the way in pipe rehabilitation. - Protecting the sewer system that has supported comfortable living for many years. - Aging pipes that have exceeded their useful life are increasing, particularly in urban areas. - Aging sewer pipes can cause leaks and unknown inflow of water in various locations, potentially leading to road collapses. The door to the era of pipe rehabilitation has already been opened. - Rehabilitation of sewer pipes is carried out reliably and swiftly. - By exposing to light (ultraviolet), a uniform, reliable, and seamless rehabilitated pipeline is achieved. **Applications** - Reconstruction and prolongation of the lifespan of aging or damaged sewer pipes.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ● Reconstruction and prolongation of the lifespan of aging or damaged sewer pipes.
Company information
Since its establishment, our company has played a role in national construction, primarily focusing on the "ground improvement field" with our unique grouting method. Subsequently, in response to the changes in social infrastructure development, we have refined our technologies to adapt to the needs of the times and, at times, acquired new ones to expand our business scope. As a result, we have now established three main pillars: "ground improvement business," "slope disaster prevention business," and "pipeline business."