No need for reinforcement legs directly under the partition! You can freely move or install new partition walls even after moving in.
This construction method is a top-type floor-first method that takes the environment into consideration, enhances work efficiency, and achieves high economic viability. It does not require reinforcement legs directly under the partitions, making it suitable for floor-first construction. Since there is no need for reinforcement directly under the partitions even after the subfloor work is completed, it allows for the free movement and new installation of partition walls even after occupancy. Additionally, our company offers a lineup including "T-50U," as well as "T-SU," "T-DU," and "T-UH." 【Features】 ■ Adopted in the Nagano Olympic Village (1998) ■ Suitable for floor-first construction ■ Easy to accommodate free plans ■ No reinforcement legs required directly under the partitions *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Lineup】 ■T-50U ■T-SU ■T-DU ■T-UH ■T-U *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in the development, manufacturing, and sales of the dry double floor "Top System Floor." We offer a lineup that includes the partition wall advance construction method "T-W" and the floor advance construction method "T-50U." Please feel free to contact us if you have any inquiries.