Construction is possible up to 80m! It is a low noise, low vibration method.
The "STJ Method" is a construction method for precast concrete piles that falls under the category of low-noise and low-vibration methods for the middle excavation and enlarged root solidification. By switching the auger's rotation to a low speed and jetting cement milk from high-pressure injection nozzles in two directions while raising the auger at a constant speed, a reliable enlarged bulb is constructed. 【Features】 ■ Reliable construction of enlarged bulbs ■ High bearing capacity ■ Rapid construction ■ Low construction costs ■ Low earth discharge method *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Efficiency (Guideline)】 ■100m/day *This may vary depending on construction conditions, heavy machinery, and ground conditions. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Toyo Asano Co., Ltd. is engaged in the manufacturing of various prestressed concrete piles utilizing centrifugal force, as well as the responsible execution of construction related to pile products. The design strength of the concrete used in our main product, precast piles, is high-strength concrete of 80 N/mm² or 85 N/mm² or higher. Additionally, with our ministerial certification method, we propose the most suitable construction method from various options, taking into account the performance of the building.