The drainage function during testing keeps the sprinkler piping dry without filling it with water! Due to the electric three-way valve, connecting it to the water supply prevents stagnant water!
It operates based on signals from the electric valve control panel SBK-25Z of the specific facility water supply connected sprinkler system (dry type).
Inquire About This Product
basic information
■ Electric Valve Storage Box SBK-25K Specifications External Dimensions: W=600mm H=400mm D=200mm Body Material: Steel Plate t=1.6 Color: Approximate color 2.5Y9/1 with 50% gloss Weight: Approximately 23kg Internal Piping: Lead-free ball valve, electric three-way valve, manual three-way valve (for testing and drainage), manual release valve (for emergency), manual release valve (for electric three-way valve shaft) (for emergency) *All are certified products by the Japan Water Works Association, nominal diameter 25A *Water supply pipes must have a nominal diameter of 25A or larger. *Please install it at least 800mm above the ground. *To prevent stagnant water, install it close to the branching point from the water supply piping or connect it to a water supply faucet or sprinkler faucet. *Please take measures against freezing for the primary side piping inside the storage box. *Seal the installation surfaces with caulking on the top and sides against the wall. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Examples of Use】 ■Hospital ■Inpatient Clinic ■Group Home ■Single-family House ■Apartment Building ■Small-scale Facility *For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
[Normal valve position and water flow] Water enters from A and flows to the right (primary side) through B (electric three-way valve). When a signal is received from the control panel (during a fire), B (electric three-way valve) operates and changes the water flow to the left (secondary side), filling the fire extinguishing pipe. *Please set the handle at A vertically, the handle at C vertically, and the handle at D vertically.
-
[Position of the valve and water flow during testing] If you are testing whether B (electric three-way valve) operates normally without filling the fire protection pipe, please position the handle C horizontally. *After the test is completed, please return the handle C to the vertical position.
-
[Position of the valve and water flow during drainage] When draining the water filled in the fire protection pipe, please turn the handle C to the right by 45° to drain. After the drainage is complete, please return the handle C to the vertical position.
-
[Position of the valve and water flow during emergencies] If for some reason the B (electric three-way valve) does not operate, you can fill the fire suppression pipe by turning the handle D horizontally. *Note: D should never be opened (handle horizontal) during normal conditions.
catalog(6)
Download All Catalogs




Company information
Toho Electric Co., Ltd. deeply recognizes the importance of quality assurance and environmental conservation. As a company that provides current limiters, related components, and electromagnetic products that are trusted and satisfying to our customers, we contribute to society while each individual engaged in our business actively works towards further improving quality, conserving the environment, and preventing pollution.