A steel pipe middle-boring pile method using a cement milk spraying and mixing technique that is highly efficient in construction and effective for shortening construction periods!
The "TN Method" involves excavating while discharging soil from inside the steel pipe pile using an auger screw inserted into it. After reaching the designated bearing layer, cement milk is injected at high pressure and solidified, using the constructed enlarged bulb at the tip to support the structure with foundation piles. It is widely applicable in both civil engineering and construction fields, and can also be applied to steel sheet pile foundations. 【Features】 ■ High excavation performance, capable of long-length construction ■ Wide applicability with abundant track record ■ Applicable to steel sheet pile foundations ■ High construction efficiency, effective for shortening construction periods *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Main Uses】 ■ Foundations for civil engineering and architectural structures *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in the sale of concrete piles and steel pipe piles, as well as contracting for pile driving work and ground improvement work. Since our establishment, we have built the "Tenox Brand" in foundation work. Moving forward, we will strive to enhance our brand power through the creation of new value, in order to meet the expectations of all our stakeholders.