A pioneering method for pile driving using a detachable small pile driver, suitable for narrow sites and areas with height restrictions!
Our company utilizes the OTO drilling machine (a dismantlable small pile driver) and conducts the dismantlable small pile driving method known as the "OTO method." We can transport the equipment to the construction site using a monorail, helicopter, or 3.0t truck, and assemble it on-site for construction. This method is applicable in locations where conventional pile drivers (such as Aboron or three-point types) are difficult to transport, such as mountainous areas or narrow sites. 【Features】 ■ All parts can be disassembled to under 3.0t ■ Applicable for construction in locations where conventional machinery is difficult to transport and operate ■ Selection of leader length is possible ■ Selection of drilling method is possible *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Details of Construction Method】 ■ Selection of Leader Length ・5.0m ・8.0m ・10.0m ■ Selection of Excavation Method ・Auger Excavation ・Down-the-Hole Hammer Method ・Casing Combined Method, etc. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company offers a comprehensive range of services, from obstacle removal work in construction to foundation pile work, as well as the installation and dismantling of temporary structures required for the project. In recent years, we have focused on the rapidly increasing obstacle removal business and have a proven track record primarily in the metropolitan area. Additionally, leveraging the know-how we have developed, we are able to provide a unique continuous service for foundation pile work and temporary construction following obstacle removal. Please feel free to contact us if you have any inquiries.