Effective repair methods for addressing combined deterioration due to ASR and salt damage!
The "Hydraulic High-Pressure Injection Method ASR Lithium Method" is a repair method that fundamentally treats concrete structures deteriorated by alkali-silica reaction (ASR). By internally injecting "Procon 40" throughout the concrete members, it non-expands the alkali-silica gel, which is the cause of ASR, and can fundamentally suppress the progression of ASR deterioration thereafter. 【Features】 ■ Fundamental ASR suppression measures ■ Effective rebar rust prevention measures *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Specifications】 ■ Insertion Device: Hydraulic insertion device "Rehabilitation Insertion Machine" ■ Inhibitor: Penetrating diffusion type lithium nitrite "Procon 40" ■ Injection Amount: Determined quantitatively based on the total alkalinity of the concrete (for ASR) or the amount of chloride ions (for salt damage) ■ Injection Pressure: Determined for each structure based on the degree of concrete deterioration within the range of 0.5 MPa to 1.5 MPa ■ Insertion Hole ・Drilling Diameter: φ10mm or φ20mm (determined based on drilling depth) ・Drilling Interval: 300mm to 1,250mm (determined based on member dimensions and structural scale) *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Fukutoku Giken Co., Ltd. was established in November 1966 as Fukutoku Development Co., Ltd. with the aim of engaging in civil engineering and real estate transactions. Since then, the company's business model has evolved with the trends of the times, and in 1977, it was renamed Fukutoku Painting Industry Co., Ltd. due to the expansion of its painting business. In recent years, we have focused on the investigation, design, and repair work related to the deterioration of concrete structures, including bridges, pursuing the establishment of unparalleled technology and striving for high value-added business. Additionally, in our traditional painting business, we have been working on improving quality backed by high technology. To further clarify the company's policy of aiming for steady growth with a focus on technological refinement, we decided to change our name to Fukutoku Giken Co., Ltd. on May 10, 2010. Taking this opportunity, all employees are united in renewing our commitment to the development of our business.