Measures for asbestos removal are being strengthened!
This document introduces the promulgation of the revised law strengthening asbestos countermeasures. The "Law to Partially Amend the Air Pollution Control Act" was promulgated on June 5, 2020. Additionally, the "Ministerial Ordinance to Partially Amend the Asbestos Hazard Prevention Regulations" was also promulgated on July 1, 2020, and has been gradually enforced since October 1, 2020. Finishing materials are also included, and those conducting preliminary surveys are required to have qualifications. For more details, please download and view the catalog below. [Contents] ■ Finishing materials are also included ■ Those conducting preliminary surveys are required to have qualifications ■ Reporting of preliminary survey results, regardless of the presence of asbestos, is mandatory ■ Removal of asbestos-containing finishing materials using foam: "AG Bubble System" *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All CatalogsCompany information
Our company has consistently engaged in the investigation and diagnosis of reinforced concrete buildings, as well as renovation work, and from seismic diagnosis to seismic reinforcement work for many years. In recent years, we have been working as a specialized company focused on various issues such as the maintenance and preservation of various buildings and structures, improving seismic performance, environmental measures, energy conservation, and resource conservation. We will continue to respond swiftly to the diversified needs related to the safety and security of society and contribute to the creation of a "happy environment" in society.