Installation of a super plug for water stoppage! Here is an example of construction that exposes the bottom of the manhole.
We would like to introduce a construction example of the "Pump Chamber Type Manhole" using the "Super Plug System Method" handled by Nippon Plug Industry. With the new installation of the sewer system, the need for pump pressurization was eliminated, leading to the removal of the existing pump, backfilling the lower part, and constructing the invert. The construction results included the installation of super plugs on each pipe for water-stopping work, followed by the construction of the invert. 【Construction Example】 ■ Issues - Removal of the existing pump, backfilling the lower part, and constructing the invert. ■ Results - Installation of super plugs on each pipe for water-stopping work. - Exposing the bottom of the pump chamber type manhole and completing the invert. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Features of the Super Plug System Construction Method】 ■ Creates a work environment without water for sewer construction sites ■ Allows temporary water stoppage during the switching of water pipes with the super plug installed upstream ■ Compatible with large diameter sewer pipes and large box culverts *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company mainly conducts water replacement work for water supply and sewage systems. We also handle the patented construction method "Super Plug System," which allows for the free control of water flow, including stopping, flowing, and stopping again, making the impossible possible. Please feel free to contact us if you have any inquiries.