Assembly and installation of a plug in an existing pump room manhole! Example of construction to stop water at the advancement reach section.
We would like to introduce a construction example of "water stopping at the advancing reach section using the 'Super Plug System Method'" handled by Nippon Plug Industry. This project involved connecting a new pipe to an existing pump chamber manhole using the thrust method. The baffle plug was assembled inside the manhole and installed at the advancing reach section to stop the water. 【Construction Example】 ■Issue - Connecting a new pipe to an existing pump chamber manhole using the thrust method. ■Result - Assembled the baffle plug inside the manhole and installed it at the advancing reach section to stop the water. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Features of the Super Plug System Construction Method】 ■ Creates a work environment without water at the sewer construction site ■ Allows temporary water stoppage during the switching of the water conduit with the super plug installed upstream ■ Compatible with large-diameter sewer pipes and large box culverts *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company mainly conducts water replacement work for water supply and sewage systems. We also handle the patented construction method "Super Plug System," which allows for the free control of water flow, including stopping, flowing, and stopping again, making the impossible possible. Please feel free to contact us if you have any inquiries.