[Construction Example] Connection of new pipes to existing manholes; cases with multiple inflow pipes and elevation differences.
Use the super plug to seal the interior of the existing manhole! Example of installation for new pipe connections.
We would like to introduce a construction example of connecting a new pipe to an existing manhole using the "Super Plug System Method" in the case of "multiple inflow pipes with elevation differences to an existing manhole." This project involved connecting a new pipe to an existing box-type manhole with a large flow rate, which has an upstream diameter of 1800mm, a downstream diameter of 2100mm, and inflow pipes with diameters of 1200mm and 600mm, and inverting it. The construction result achieved a watertight condition inside the box-type existing manhole using the Super Plug System Method, and the connection and inversion of the new pipe were successfully completed. 【Construction Example】 ■ Issues - Connect a new pipe to an existing box-type manhole with a large flow rate and invert it. - Multiple inflow pipes with elevation differences. ■ Results - Watertight condition inside the box-type existing manhole achieved using the Super Plug System Method. - Connection of the new pipe and construction of the inversion completed. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Features of the Super Plug System Construction Method】 ■ Creates a work environment without water at the sewer construction site ■ Allows temporary water stoppage during the switching of the water conveyance pipe with the super plug installed upstream ■ Compatible with large-diameter sewer pipes and large box culverts *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company mainly conducts water replacement work for water supply and sewage systems. We also handle the patented construction method "Super Plug System," which allows for the free control of water flow, including stopping, flowing, and stopping again, making the impossible possible. Please feel free to contact us if you have any inquiries.