[Construction Example] Change of flow path when the intersection angle between existing and newly installed pipes is small.
Water-stopping work using super plugs! Introducing an example of construction with a small intersection angle for channel diversion.
We would like to introduce a construction example of "changing the flow path when the intersection angle between existing and new pipes is small" using the "Super Plug System Method" that our company handles. A new manhole was installed on the existing pipe with a diameter of 1200mm, and it was connected to a new pipe with a diameter of 1200mm, changing the flow path from the existing pipe to the new pipe. As a result of the construction, we performed water-stopping work using the Super Plug System Method, laid the new pipe, and set up a manhole with an invert, thereby changing the flow path. 【Construction Example】 ■ Issues - A new manhole was installed on the existing pipe with a diameter of 1200mm, and it was connected to a new pipe with a diameter of 1200mm. - The flow path was changed from the existing pipe to the new pipe. ■ Results - Water-stopping work was performed using the Super Plug System Method. - The new pipe was laid, and a manhole with an invert was set up, changing the flow path. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Features of the Super Plug System Construction Method】 ■ Creates a work environment without water at the construction site for sewer work ■ Allows temporary water stoppage during the switching of the water conveyance pipe with the super plug installed upstream ■ Compatible with large-diameter sewer pipes and large box culverts *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company mainly conducts water replacement work for water supply and sewage systems. We also handle the patented construction method "Super Plug System," which allows for the free control of water flow, including stopping, flowing, and stopping again, making the impossible possible. Please feel free to contact us if you have any inquiries.