Ensure proper emission and restore the land to its original state! Our company has obtained a patent for the DMP method.
The "DMP Method" is an underground buried pile removal and replacement method that allows for the smooth removal of columnar improved piles. By embedding a stabilizing device, the improved body can be completely removed, and with the power of compressed air, it can be reliably discharged to the surface. Additionally, the use of stabilizing casing and a hopper ensures that the discharged soil does not mix with the natural soil. 【Features】 ■ Complete removal ■ Reliable discharge ■ Restoration to original condition ■ No mixing ■ No subsidence *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Business Flow】 ■ Position Set ■ Improved Body Crushing ■ Crushing Completed ■ Shell Removal ■ Hopper Set ■ Backfilling ■ Completion *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Removal of columnar improved piles *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Takahashi Heavy Machinery Co., Ltd. has consistently upheld the motto "Reliable work, done more quickly" since its establishment, implementing a safety-first principle. With our top recommended construction method, "pile extraction construction," along with many other cutting-edge technologies and heavy machinery, we deliver high-quality civil engineering work. Additionally, as a local company, we offer flexible services such as ground surveys and ground guarantees, so please feel free to consult with us.