A 65-inch display is placed in the center front! Introduction of a case study on the production and processing of a railway monitoring system monitor shelf.
We would like to introduce a case study of the production and processing of a railway monitoring system monitor shelf conducted by Nagasawa Koki Co., Ltd. A 65-inch display is located in the center front, and there are 26 units of 15-inch displays in the upper window. Our company specializes in thin sheet metal processing and strives to achieve high quality even with short lead times as a professional in precision sheet metal processing. 【Case Study】 ■ Product Name: Railway Monitoring System Monitor Shelf ■ Dimensions (mm): 6200*2600*700 ■ Material: SPCC t=2.3mm ■ Surface Treatment: Painting (Melamine baked N3.5 Leather Tone) ■ Standard Lead Time / Lot: 7 days / 1 unit ■ Process Introduction - Programming, punching, tapping, bending, welding, inspection, painting ■ Comments - 65-inch display positioned in the center front - 26 units of 15-inch displays positioned in the upper window *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Eisawa Koki Co., Ltd. specializes in thin sheet metal processing and, as a professional in precision sheet metal processing, strives to achieve high quality even with short delivery times. We can freely process metals such as iron, aluminum, and stainless steel, and we accept precision sheet metal processing in various shapes. We also welcome inquiries regarding other materials, so please feel free to contact us.