On-site construction is possible even in narrow areas where plants cannot be built or under conditions that require long-distance transportation!
The "Dust NON Method" is a technique used for on-site improvement of raw soil. It autonomously travels from the bulk material transport vehicle to the soil improvement site, receiving solidifying agents, and fixes the discharge chute at the end of the silo's discharge screw conveyor to the lid of the storage device of the soil improvement machine, allowing for the pressure transfer of the solidifying agent. By directly sealing it, there is no dust dispersion. 【Features】 ■ Prevention of dust-related disasters ■ Reduction of solidifying agent costs ■ Improved safety without the need for cranes ■ Labor-saving in solidifying agent supply operations ■ Stable storage capacity for solidifying agents *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 ■ No dust generation, preventing dust-related disasters and environmental issues ■ Can use paraffin as a solidifying agent ■ No crane operation required for lifting and loading bulk bags ■ Eliminates the need for the cumbersome transfer and loading required by conventional methods ■ Stable storage possible with silos *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Mori Corporation is engaged in civil engineering, construction, renovation, and crushed stone businesses. Infrastructure development projects are essential for a safe and comfortable life. Buildings that contribute to the development and maintenance of rich urban living and industries. Our business supports these social assets and your way of life.