[Case Study - Automotive Parts Manufacturing] Proposal for Production Management Utilizing Sensors
Real-time visualization of the site! Case study on the pilot implementation of automotive parts manufacturing.
We would like to introduce a case study of the implementation of our sensors in the automotive parts manufacturing site. Since real-time CT measurements of each production machine were not being conducted, there was a request to test the introduction of multiple units. We introduced one master unit (receiver/transmitter) and ten slave units (transmitters) for a period of three months, measuring and analyzing each issue in real-time. 【Case Study】 ■ Purpose - Real-time CT measurements of each production machine were not being conducted, so multiple units were introduced for testing. ■ Implementation - Receiver/transmitter: 1 unit - Transmitter: 10 units - Implementation period: 3 months *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Analysis Content (Excerpt)】 ■ Measure actual production volume, cycle time (CT), and availability rate, and analyze past causes ■ Detect abnormalities in cycle time (CT) in real-time and conduct analysis ■ Display the causes of downtime in real-time *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Esco Corporation is a company that advocates the necessity of social infrastructure and information communication business, thinking and executing from the perspectives of ECO and electronics. With a focus on quality and a humble commitment to daily improvement, we pursue The Effective Service Company with a sense of urgency that avoids inward thinking.