Collaboration with steel manufacturers allows for component adjustment, short delivery times, and direct transactions!
We would like to introduce the VA case of "Ultra High-Pressure Steel Pipes for Plant Piping" from Daiichi Heat Treatment Industry Co., Ltd. By changing the material shape, we are able to accommodate small lots and short delivery times. Additionally, we uniquely satisfy user demands in ways that others cannot, and we have a proven track record of delivering in as little as 4 months with overwhelming responsiveness that cannot be matched overseas. 【Benefits】 ■ Material Procurement - Reduction of intermediate margin by 5% - Freedom in product size through round bar processing ■ BTA Processing - Reduction of horizontal handling time - Consideration of all processes up to finishing ■ External Cutting Processing - Reduction of horizontal handling time - Ensuring the same concentricity even for long lengths and small diameters *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Benefits】 ■Cold Drawing - Processed into product shape through cold drawing - Target values set in 0.1mm increments considering finishing dimensions ■Heat Treatment - Shortened delivery times - Cost reduction through process simplification *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We provide a consistent system from material to product with our in-house facilities, including metal heat treatment, machining, ultrasonic testing, and mechanical testing. Significant cost reduction in the manufacturing of round bar quenching is achieved with Ichinetsu's non-bending barrel-type continuous heat treatment furnace. ISO 9001/2000 certified factory.