Dual USB Type-C PD Fast Charging + 2.4A 2 Type-C PJ Type
2 type C PJ type
It is a charger for fast charging of smartphones.
Appearance: Dual-port type C +2.4a PD fast charger
Inquire About This Product
basic information
- Model number: 2 type C PJ type - Input: 100-240V - Output: 1 port type C (PD fast charging USB type C) + 1 port USB (regular charging USB type A) 5V 2.4A 12W - Shell material: ABS resin, black/white - Shell size: 51*51*28mm, volume 73cm³, weight 60g - IC protection: heat/voltage/current/short circuit - Application: PD fast charging for iPhone - Compatible devices: PD fast charging compatible iPhone 8 to iPhone with PD cable - (Connection method with compatible devices): This PD charger C port → (iPhone PD cable → iPhone 8 to) (Note: Detailed explanation will be provided for USB chargers in general)
Price information
(Reference Order Production Unit Price) The tax-included unit prices for order production based on quantity are as follows: - Quantity 4000: 990 yen - Quantity 2000: 1010 yen - Quantity 1000: 1040 yen Reference tax-included unit prices when stock is available: - Quantity 100: Reference 1140 yen - Quantity 10: Reference 1250 yen - Quantity 1: Reference 1350 yen Representative display unit price: 1350 yen for quantity 1 Since the unit price varies by quantity, please contact Hiroshi Tsuchiya at ttt@zd.wakwak.com if you wish to request a different unit price.
Price range
P1
Delivery Time
※About 40 days
Applications/Examples of results
PD fast charging compatible charger primarily designed for rapid charging of iPhone 8 and later, also capable of charging non-PD compatible Android smartphones, with 5V 2.4A and two Type-C ports.
Detailed information
-
Dual-port PD charger
Company information

アソシエイト トレーディング 土屋 裕 v09018951120 qq3508274141 ttt@zd.wakwak.com
Associate Trading Co., Ltd. will produce products based on the following policies: 1. As a trading company, we generally do not hold product inventory. 2. The transaction terms are: advanced payment; depending on the product, the lead time is approximately 40 days for made-to-order production. 3. Once the order is confirmed, we will issue an order confirmation. 4. Deliveries will be made in installments as much as possible, allowing users to see and try the products themselves while confirming the quality during delivery. 5. Therefore, we ask users to set lead times that allow for as much flexibility in partial deliveries as possible. 6. For users with ongoing transactions, we generally appreciate your understanding of the stabilization of lead times through procurement from multiple companies. 7. In the unlikely event that there are issues with quality, lead time, cost, or transportation, flexible responses can be made through procurement from multiple companies. 8. Our company directly deals with approximately 500 factories in China, so you can trust us to handle your needs with confidence.