Automation of old rail handling operations in long rail replacement (mechanical).
Our company offers a "rail organizing cart" that allows for easy adjustment of the unloading position by extending and retracting the arm. By following the long rail exchange machine, it unloads the old rails outside the construction limits. Additionally, since it is a towable type, no power source is required. 【Specifications】 ■ Dimensions (Length/Width/Height): ・(Minimum) 2040×706×361 (Center) 470 (Both ends) mm ・(Maximum) 3200×706×361 (Center) 470 (Both ends) mm ■ Left and Right Single Stroke: Stroke 580 mm ■ Left and Right Roller Holding Angle: Vertical (90°) / Holding Angle (45°) ■ Weight: 255 kg *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since its establishment in 1943, our company, as a comprehensive construction business of the JR West Japan Group, has built unique technologies and know-how. We have been engaged in the construction of new railway lines and the maintenance and inspection of tracks, as well as undertaking national projects such as the Kyushu Shinkansen and the Sanyo Shinkansen. Our company's characteristic is the ability to integrate the technologies and know-how accumulated in our three divisions: "Railway," "Civil Engineering," and "Architecture," demonstrating high technical capabilities. By pooling these strengths, we carry out a wide range of projects related to transportation and daily life, including railway-related construction, station buildings, condominiums, highways, and bridges.