We can extract any type of pile from the tip! Choose from three types of pile extraction methods tailored to the site.
The "OK Method" is a pile extraction technique that forcibly chucks the tip of the pile using a special casing, allowing for the extraction of existing piles from the tip. It enables proper backfilling simultaneously with the extraction of the pile. As it is a noiseless and vibration-free method, it can be implemented in various locations, including urban areas, office districts, and residential areas. 【Features】 ■ Safe construction ■ Smooth operation ■ Short construction period ■ Noiseless and vibration-free work *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Type】 ■Large type ■Medium type ■Small type *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts the complete removal of existing piles using methods such as the OK method (existing pile extraction work) and the AK hammer method (AK core extraction work) with our own equipment. With excellent process management and construction capabilities, we can safely install new piles, remove existing piles, and eliminate underground obstacles.