Introducing a case where the introduction of a concentrated oxygen dissolution system reduced blower electricity consumption by 50%!
A concentrated oxygen dissolution system has been introduced to the flow adjustment tank. After one year of system operation, a 50% reduction in blower electricity usage is expected. Additionally, a 20% reduction in sludge extraction volume is planned. 【Case Study】 ■ Before system installation (September 12, 2008) - Transparency: 1 (including SS) - Aeration blower: 15kw × 2 units × 24 hours operation - Flow adjustment tank blower: 7.5kw × 1 unit × 24 hours operation ↓ ■ After system installation (January 18, 2010) - Transparency: 30 or more (including SS) - Aeration blower: 15kw × 1 unit × 24 hours operation - Flow adjustment tank blower: 7.5kw × 1 unit × 12 hours operation *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Sanyo Facility Engineering Co., Ltd. is engaged in the technological development of water treatment projects. We handle products such as water treatment facilities, the "ADDOX KBS Device," and the "ADDOX OIL Device." Please feel free to contact us if you have any inquiries.