[NETIS Registration] Integrated Method for Expansion Devices and Deck Waterproofing (AOS Method)
NETIS Registration Number: CB-170021-A / Patent No. 6095842 / Integrated Method for Expansion Devices and Waterproofing of Slabs - AOS Method -
Improving economic efficiency in small bridges under 20 meters.
The "Integrated Method of Expansion Device and Deck Waterproofing (ARCHIST ONEPIECE-GEL SYSTEM®)" achieves a reduction in construction time and high economic efficiency by using the same asphalt emulsion-based expansion material and waterproofing material for the installation of embedded expansion devices and membrane-type deck waterproofing. This method maintains both the expansion device function and waterproofing function in bridges. *Note: ONEPIECE-GEL JOINT and ONEPIECE-GEL PROOF must be used simultaneously.* 【Features】 ■ More than 15% reduction in construction costs compared to conventional methods ■ Easy to construct at room temperature, allowing for shortened construction time ■ Passes performance verification tests for 15 years *For more details, please contact us or download the PDF to view.*
Inquire About This Product
basic information
【Scope of Application】 ■ Beam Type: Prestressed Concrete Beam / Reinforced Concrete Beam ■ Beam Length: General: 20.0m or less / Cold Regions: 16.0m or less ■ Allowable Range of Deck Joint - Filling Width (Joint Width): Standard 10 to 20mm (Construction Tolerance Range -0mm, +4mm) - Filling Depth: Standard 20mm (Construction Tolerance Range -0mm, +10mm) ■ Sloped Bridge (Angle): Up to 60 degrees ■ Pavement Thickness: Roadway 50mm or more, Sidewalk 40mm or more (up to 120mm) ■ Composite Slope: 6% or less (Composite Slope) * If not included in the above scope of application, we will individually determine the applicability, so please inquire. * For bridge deck waterproofing materials, the use of room temperature type coating waterproof materials (ONEPIECE-GEL PROOF) and coating type deck waterproofing (asphalt heating type) is possible.
Price information
The price varies depending on the quantity. Please feel free to contact us.
Delivery Time
※For more details, please contact us.
Applications/Examples of results
【Construction Achievements】 Fiscal Year 2016: 3 bridges Fiscal Year 2017: 11 bridges Fiscal Year 2018: 24 bridges Fiscal Year 2019: 63 bridges Fiscal Year 2020: 106 bridges Fiscal Year 2021: 35 bridges (as of the end of July 2021) 【Major Construction Examples】 ■ Gifu Prefecture, Gifu City, Daiyon Onohashi: Bridge seismic reinforcement work (Daiyon Onohashi) (February 2017) ■ Nagano Prefecture, Nozawa Onsen Village, Yuzawa River Bridge: Fiscal Year 2017 Social Infrastructure Development Comprehensive Grant Bridge Repair Work (Yuzawa River Bridge) (November 2017) ■ Aichi Prefecture, Kariya City, Benten Bridge & Miyahigashi Bridge: Ieshita No. 1 Bridge and other bridge repair work (January 2018) ■ Kochi Prefecture, Ministry of Land, Infrastructure, Transport and Tourism, Shikoku Regional Development Bureau, Nakamura River National Road Office, Kamagataya Bridge: Fiscal Year 2017-2018 Kamagataya Bridge and one other bridge repair work (June 2018) ■ Toyama Prefecture, Tateyama Town, Road Bridge: Fiscal Year 2018 Town Road Soga Line Bridge Repair Work (October 2018) ■ Nara Prefecture, Totsukawa Village, Mikyo Bridge: Bridge repair work, Forest Road Uchihara Line (Mikyo Bridge) (November 2018) ■ Fukuoka Prefecture, Kasuya Town, Mineyashiki No. 2 Bridge: Mineyashiki No. 2 Bridge repair work (December 2018) ■ Mie Prefecture, Shima City, Taisho Bridge: Social Infrastructure Development Comprehensive Grant Project, Taisho Bridge Bridge Repair Seismic Reinforcement Work (December 2018) *For more details, please feel free to contact us.
Detailed information
-
Cross-section diagram Expansion device / Floor waterproofing layer composition cross-section diagram
-
Application of elastic material Application status of ONEPIECE-GEL JOINT (elastic material)
-
Application of mesh sheet Installation of expansion device
-
Application of primer Status of primer application on the entire floor slab
-
Application of waterproofing material Apply the waterproofing material over the entire floor slab and scatter silica sand.
catalog(1)
Download All CatalogsCAD data(1)
Model number | overview | File |
---|---|---|
[NETIS Registration] Integrated Method for Expansion Devices and Deck Waterproofing (AOS Method) Sample CAD | NETIS registered construction method exclusively for small-scale bridges with a span length of 20m or less. It integrates the installation of expansion devices and deck waterproofing work to protect the bridge from water. Attached is the general drawing for the construction method repair. |
|
Company information
Our company develops and proposes methods, applications, tools, and materials to comprehensively support the efficiency of infrastructure maintenance (inspection, diagnosis, repair design, and repair work) for small-scale bridges under the "Bridge Artisan ARCHIST" series. We will continue to develop advanced applications and tools for the inspection and investigation of small-scale bridges, as well as innovative technologies and materials for maintenance and repair, and present them to everyone.