Enabling the construction of the DSP method in combination with the freezing method! An example of sealing the base of a double T-pipe.
As a professional in renewal construction, Daiyu Freeze continues to protect the city's lifelines by conducting buried water supply pipe work. Here, we introduce a case of the DSP method for sealing the base of a dual-receiving T-pipe. 【Construction Example】 ■ DSP method for sealing the base of a dual-receiving T-pipe 【Construction Explanation】 ■ The branch side of the dual-receiving T-pipe was no longer needed, so it was removed using the DSP method and sealed at the base. ■ Even if there is a curved pipe attached to the branch side of the dual-receiving T-pipe, the combination with the freezing method made it possible to implement the DSP method. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Daiyu Freeze Co., Ltd. provides freezing methods associated with pipe construction. As professionals in renewal construction, we continue to protect the lifelines of the community. Please feel free to contact us if you have any requests.