We will further reduce the amount of concrete and the amount of excavated soil.
The "newACE method" is an earth drill type of cast-in-place concrete pile with an enlarged base. By achieving a reduction in pile volume compared to conventional methods, it allows for a decrease in the amount of concrete and excavation volume. Additionally, by facilitating construction management, it has become possible to carry out construction reliably. The construction process after the enlarged base excavation is the same as that of traditional cast-in-place pile methods. 【Features】 ■ Reduction of concrete and excavation volume ■ Leveling of the periphery of the enlarged base ■ Reliable treatment of the hole bottom ■ Applicable to concrete design strength standards up to Fc=60N/mm2 ■ Easy management of the enlarged volume *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Lineup】 ■SDX207-2 ■SDX407-2 ■ED6200H-2(T) ■MH5510B ■MX6515B ■ED8200H *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Toyo Techno Co., Ltd. conducts cast-in-place pile construction, precast pile construction, underground obstacle removal work, chimney silo construction, and anchor work. Please feel free to contact us if you have any inquiries.