Introducing a case study of a two-story elevated logistics center construction!
We will introduce examples of "system construction" that allow for the selection of suitable roofs, walls, and structures based on the intended use, size, and regional environment of factories and warehouses, achieving short construction periods and low costs. At a logistics center in Saitama Prefecture, a two-story high-floor steel structure has been built with platforms on both sides in the direction of the beams for the loading and unloading of products. 【Construction Example】 ■ Completion Date: November 2011 ■ Location: Saitama Prefecture ■ Total Floor Area: 16,694 m² (5,049.93 tsubo) *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kawata Industrial Co., Ltd.'s Construction Division is engaged in the construction of hospitals, offices, and multi-family housing, among other projects. Additionally, we are involved in the design and construction of special buildings represented by the Ushiku Great Buddha, the evolution of system construction methods introduced from the United States for the construction of large space production and logistics facilities, and we contribute to society through the provision of environmental products such as greening and geothermal heat pump systems.